Creative Conceptual Programming and Budgeting
On 4725 South Lowell, The original project plan conceived by Denver Housing Authority (DHA) and architect WORKSHOP8 involved renovating...
Strong Pricing and Budget Phase Leadership
CSU hired Pinkard to work with the architect during programming to assist with pricing and budget, instead of at the end of schematic...
Pinkard Self Performs Unique Design Features
On the Moorhead Recreation Center project, BRS’s amazing rope wall was thoroughly mocked-up in miniature during design. During bidding,...
Tackling Wooden Ceiling Cloud Craftsmanship Challenges
On the Moorhead Recreation Center project, The rolling, off-set ceiling system consists of custom-made 4 X 8 wooden panels running...
An Immense Natatorium Sequencing Challenge
Pinkard Construction Company won the Moorhead Recreation Center project through a competitive bid process. Scope of work included...
Creative Old-School Craftsmanship Maintains Design Intent
Parikh Stevens Architects Principal Harsh Parikh: “We designed Vida with eight different skin materials to create a visually interesting...
Creative Sequencing for Skin- Installation Maximizes Quality
Pinkard could not rely on the traditional ground-based scaffolding system for skin installation because the lot-line construction and...
Critical Roofing Crisis Averted
Two weeks before roofing on Vida was scheduled to begin, we got the devastating news that our roofing subcontractor was closing its Denver...
First-of-Its-Kind Approach to Dry-In
With “normal” mid-rise construction, a building has to be completely dried-in before electrical rough-ins can begin. This means that the...